86exporter.com Home       Products Catalog      Suppliers Catalog      Log In        Sign up
      About Us
      Profile
      Products
      Contact Us


SHANDONG SAIGAO GROUP CORPORATION

Products >> Hydraulic Liner Hanger Tie-Back Assembly

Hydraulic Liner Hanger Tie-Back Assembly

Build Your Online Product Catalogs?



Description
Product Name: Hydraulic Liner Hanger Tie-Back Assembly
Supply Ability: 500000tons
Related proudcts saigao group, polish rod liner, hydraulic hanger,
Specifications Hydraulic Liner Hanger Tie-Back Assembly
Price Term:
Port of loading:
Minimum Order 1set
Unit Price: $5-$200000


The tie-back assembly is a special cementing tool for tieback operation.

Tieback equipment allows existing liners with a receptacle to be extended to the surface or farther up hole, and provides a high-pressure seal at the top of a cemented or uncemented liner. TIW offers variety of tieback seal nipples and tieback packers to accommodate liner top extension and remedial operations. Today, some new types of drilling liner tieback equipment are developed due to the annular gas channeling in high-pressure oil-gas well even after tie back cementing.

Tie back liner procedure of Hydraulic Liner Hanger Tie-Back Assembly
A. Preparation before casing

Measure and drift the casings carefully and clean all the threads.

Calculate the kelly-up of the casing (the particular part of the last casing which is above the rotary table) and arrange the casing string.

Prepare several casings, which are approximately 0.5m shorter than the others and convenient for kelly-up calibration. (The actual kelly-up is not equal to the calculated value due to measurement error and the remaining threads of the casings.)

B. Polishing the polished bore receptacle

Connect the milling shoe and trip in. Polish the inner surface of the polished bore receptacle, make sure there is no debris.

Note the depth of the milling shoe when it reaches the top of the seal assembly (judge from the changes on pressure and WOB). Then lift the drill string for 1m.

Use a drilling rate of 40กซ50rpm and a normal flow rate. Slowly lower the drill string. Polish the inner surface of the polished bore receptacle twice or three times. Each time polish 3กซ4min. During the last polishing, apply an additional load of 2กซ3t when the torque suddenly increases (the milling shoe reaches the top of the seal assembly) during the last polishing. Polish for another 2~3min and note the depth of the milling shoe, which is an important clue for the casing setting depth.

Contact Us
Company: SHANDONG SAIGAO GROUP CORPORATION
Contact: Mr. saigao group
Address: Zhongrun Century Center, No 12111,Jingshi Road, Lixia District
Postcode: 250000
Tel: 0531-69959201
Fax: 0531-69959201
E-mail:         


Copyright© SHANDONG SAIGAO GROUP CORPORATION All Rights Reserved.
Tel : 0531-69959201 Fax : 0531-69959201
Powered by 86exporter.com